So after the first day out it was time to start making it quicker

the pile of bits that has been removed
Fitted the dyna 2000 and needed to set the timing ................ not a hard job , just remove the plugs, get TDC , use a degree wheel , job done , easy realy ............................ untill I couldent remove number 4 plug , f**k , then manage to snap the hex off the plug leaving the rest still locked in the head , double f**k , ok remove centre of plug - that was easy as it popped out on winding it over on the starter, used some penetrating oil left it over night , did it again and left for another 24 hours , had the right size ez out , still couldent get it to move , about this time a mate reminded me that if I broke the ez out off in the plug I would have a problem ..............

the photo tells it all ..........................
So the head is now removed , there not a machine shop open in Christchurch that can do the job as its Xmas and new year and they are all closed
on the bright side of all this the cams , valves , pistons and bores are all in as new condition so now realy do beleave that it has only done 13000km and now that the head is off it'll get 60 thou machined off it to up the compression a bit

so as i wait for the head to be repaired have stripped the wiring loom out of the old girl , will make a total loss system and lower the surspension , remove one of the front disc's , remove any thing else that I can to get the weight down